Proven Grid Infrastructure

Mongolia's Clean Energy Infrastructure

We deliver bankable utility-scale solar, advanced BESS integration, and high-voltage transmission lines engineered specifically for the extreme sub-zero Mongolian climate.

Wide-angle view of Sainshand solar panels paired with white BESS containers under crisp, high-contrast sunlight.
Wide-angle view of Sainshand solar panels paired with white BESS containers under crisp, high-contrast sunlight.
Heroic low-angle shot of high-voltage transmission lines stretching into the horizon across the Mongolian steppe.
Heroic low-angle shot of high-voltage transmission lines stretching into the horizon across the Mongolian steppe.
Heavy industrial mining facility with a large-scale solar array in the foreground under clear, sharp daylight.
Heavy industrial mining facility with a large-scale solar array in the foreground under clear, sharp daylight.
Proven Delivery

Utility-Scale Case Studies

Sainshand Solar & BESS

A pioneering hybrid project combining fifty megawatts of solar generation with advanced battery storage, stabilizing local frequency fluctuations in extreme sub-zero terrain.

Choir Transmission Line

Construction of a high-voltage transmission line spanning eighty kilometers of remote steppe, linking regional industrial mining hubs directly to the state grid.

Oyu Tolgoi Integration

Custom commercial and industrial solar array integrated with dedicated backup storage, providing uninterrupted power supply to heavy mining operations.

Technical Metrics

Engineered for the Grid

120 MW

Installed capacity

220 kV

Transmission capability

99.8%

Operational uptime

Let's Build the Future

Partner with Mongolia's leading EPC and project developer to secure bankable, climate-resilient energy infrastructure that meets international standards.