Grid Infrastructure

Powering Mongolia's industrial energy future

GSZ delivers bankable solar PV, high-capacity battery storage, and extreme-climate transmission lines designed to stabilize the regional grid and secure heavy industrial operations.

400MW+

Pipeline Capacity

-40°C

Engineered Tolerance

Project Intake

Secure your grid connection

Connect directly with our engineering and project delivery teams to initiate technical modeling, grid connection assessments, or investment proposals tailored for extreme sub-zero conditions.

Technical FAQ

Answers for partners

Key parameters regarding our engineering standards, project delivery timelines, and grid integration capabilities in Mongolia.

What is your sub-zero engineering standard?

What is your typical project delivery timeline?

All GSZ substations, transmission lines, and BESS enclosures are engineered to maintain full operational uptime down to -40°C, utilizing active thermal management and reinforced structural alloys.

EPC timelines vary by scale, but a standard 50MW Solar PV + BESS hybrid installation typically spans 12 to 18 months from initial technical modeling to final grid commissioning.

How do you manage grid frequency regulation?

Do you assist with local grid permitting?

Our integrated BESS solutions utilize advanced control systems that interface directly with the national grid, providing rapid response frequency regulation and active power curtailment management.

Yes. Our local engineering team manages the entire regulatory process, including grid impact studies, technical connection agreements, and final state commission approvals for all utility-scale projects.